Changes to a 380 kV transmission line require a clear understanding of how the proposed configuration affects its structures. Tower assessment connects the revised conductor and earth-wire forces with the capacity of members, connections and foundations.
Our engineering support focuses on defining the relevant loading conditions, assessing the affected structures and developing modifications where required. Clear calculations and documented assumptions help the project team evaluate its options and coordinate the next design stage.